Qiu Lin writer rcl container tracking Kim Moon House for Container Terminal. After the trailer carrying the quay container unloaded from the ship's bridge container shipped to the yard or rear, stacking up by the container gantry crane or direct loading carried rcl container tracking away, you can speed up the container carrying the crane bridge or other turnaround. Can be stacked three to four layers high, wide and 6 rows of container yard, usually with tire also useful rail style. Container rcl container tracking gantry cranes and container straddle compared to its height and span both sides of the door frame are larger. In order to meet the transport needs of the port terminals, higher working rcl container tracking level of this crane. rcl container tracking Lifting rcl container tracking speed of 8 to 10 m / min; span based on the number of containers needed across the row to determine the maximum is about 60 m corresponding to 20 feet, from the weight of 30 feet, 40 feet long containers were about 20 tons, 25 tons and 30 tons.
1 single girder gantry crane single girder gantry crane master simple structure, easy to manufacture and installation, small self-quality, multi-girder box-shaped frame for off-track structure. Compared with the double girder gantry crane, the overall stiffness of the weaker. Therefore, when the starting weight Q 50t, when the span S 35m, can this form. Single girder gantry crane doors leg L and C forms. L type of manufacture and installation convenience, the force was better, the smaller its quality, but, lifting leg cargo through space at a relatively small number. C-shaped feet formed inclined or curved shape, the purpose is to have a large horizontal space, so that the goods pass feet.
0
The above statements represent their personal views and do not represent the views or position of Sina.
No comments:
Post a Comment